Every London borough licenses large HMOs, most add their own scheme for smaller shared homes, and 22 of the 33 areas run selective licensing for ordinary lets. Here is each council’s scheme, where it applies and what it asks for electrically.
By the EICR London Pro team Updated 10 min read
Whether you need a landlord licence in London depends on three things: the borough, the exact address and who lives there. Mandatory HMO licensing covers large shared homes everywhere. Most boroughs add additional licensing for smaller shared homes, and 22 of the 33 areas run selective licensing, which covers ordinary lets to one household in named wards or streets. The tables below set out each council’s position and what it asks for electrically.
Licence or no licence, the Electrical Safety Standards in the Private Rented Sector and Social Rented Sector (England) Regulations 2020 apply to almost every private tenancy in England: the electrics must be inspected and tested at least every five years. The report from that inspection — an EICR (Electrical Installation Condition Report) — is the electrical evidence councils ask for when you apply. Our guide to EICRs for landlords covers the few lettings the rules leave out.
The three types of landlord licence
- Mandatory HMO licensing is national. Since 1 October 2018 it has covered every HMO (house in multiple occupation) with five or more people forming two or more households, however many storeys it has.
- Additional HMO licensing is a council’s own scheme for HMOs outside the mandatory one — usually three or four people from two or more households. Some schemes also take in converted blocks of flats (known as section 257 HMOs); others leave them out.
- Selective licensing covers privately rented homes that aren’t HMOs — a home let to one household or to two sharers — but only in the wards or streets the council has designated.
Councils set the area and dates of their additional and selective schemes, usually for five years at a time, so the map changes often.
Licensing in every London borough
Council schemes checked 24 September 2026. Schemes change — check the council page before you apply. Mandatory HMO licensing applies in every area, so it isn’t repeated below.
| Borough | Selective licensing | Additional HMO licensing | Council page |
|---|---|---|---|
| EICR in Barking and Dagenham | All 19 wards (to 5 Apr 2030) | Borough-wide (from 9 Jan 2025, for five years) | lbbd.gov.uk |
| EICR in Barnet | None — the council consulted to 15 Sep 2026 on ten wards | Borough-wide (to 27 Oct 2027) | barnet.gov.uk |
| EICR in Bexley | Belvedere ward only (to 12 Jan 2030) | None | bexley.gov.uk |
| EICR in Brent | Every ward except Wembley Park, in two schemes (3 wards to 31 Jul 2028; 18 wards for five years from 1 Apr 2024) | Borough-wide (to 2 Feb 2031) | brent.gov.uk |
| EICR in Bromley | None | None | bromley.gov.uk |
| EICR in Camden | None | Borough-wide (to 8 Dec 2030) | camden.gov.uk |
| EICR in the City of London | None | None | cityoflondon.gov.uk |
| EICR in Croydon | 14 wards (25 Sep 2026 to 1 Sep 2031) | Borough-wide (25 Sep 2026 to 1 Sep 2031) | croydon.gov.uk |
| EICR in Ealing | 15 wards on the pre-May 2022 boundaries (3 to 31 Mar 2027; 12 to 2 Jan 2028) | Borough-wide (to 31 Mar 2027; a new scheme has been consulted on) | ealing.gov.uk |
| EICR in Enfield | 17 wards (1 Sep 2026 to 31 Aug 2031) | Borough-wide (to 31 Aug 2030) | enfield.gov.uk |
| EICR in Greenwich | 5 wards around Woolwich, Plumstead and Shooters Hill (to 1 Oct 2027); 18 wards under consultation | Borough-wide (to 31 Dec 2028) | royalgreenwich.gov.uk |
| EICR in Hackney | 17 of 21 wards (1 May 2026 to 30 Apr 2031) | Borough-wide (1 May 2026 to 30 Apr 2031) | hackney.gov.uk |
| EICR in Hammersmith and Fulham | 24 named streets (to 4 Jun 2027) | Borough-wide, including converted and purpose-built flats (to 4 Jun 2027) | lbhf.gov.uk |
| EICR in Haringey | 14 wards (to 17 Nov 2027) | Borough-wide (to 16 Jun 2029) | haringey.gov.uk |
| EICR in Harrow | 6 wards, each for five years from its 2026 start | Ran borough-wide to 5 Aug 2026; renewal consulted on — check with the council | harrow.gov.uk |
| EICR in Havering | 7 wards (18 Mar 2026 to 17 Mar 2031) | Borough-wide (18 Mar 2026 to 17 Mar 2031) | havering.gov.uk |
| EICR in Hillingdon | None | Borough-wide, not converted blocks (24 Aug 2026 to 23 Aug 2031) | hillingdon.gov.uk |
| EICR in Hounslow | None | Borough-wide, including some converted blocks (to 10 Dec 2030) | hounslow.gov.uk |
| EICR in Islington | 3 wards now; 10 of 17 wards from 23 Nov 2026 | Borough-wide (to 31 Jan 2031) | islington.gov.uk |
| EICR in Kensington and Chelsea | None | Borough-wide (to 31 May 2028) | rbkc.gov.uk |
| EICR in Kingston upon Thames | None | None | kingston.gov.uk |
| EICR in Lambeth | Every ward except Vauxhall and Waterloo & South Bank, in two phases (to 2029 and 2030) | Borough-wide (due to end 8 Dec 2026) | lambeth.gov.uk |
| EICR in Lewisham | Most of the borough, not the Telegraph Hill area or part of Blackheath (to 1 Jul 2029) | Borough-wide (to 4 Apr 2027) | lewisham.gov.uk |
| EICR in Merton | 4 wards (to 23 Sep 2028) | 7 wards (to 23 Sep 2028) | merton.gov.uk |
| EICR in Newham | 22 of 24 wards (to 31 May 2028) | 22 of 24 wards (to 31 Dec 2027) | newham.gov.uk |
| EICR in Redbridge | 17 of 22 wards, in two schemes (to 31 Oct 2028 and 7 Apr 2029) | Borough-wide (to 17 Sep 2028) | redbridge.gov.uk |
| EICR in Richmond upon Thames | None | None | richmond.gov.uk |
| EICR in Southwark | 19 wards (14 to 31 Oct 2028; 5 due to end 1 Mar 2027) | Borough-wide (due to end 1 Mar 2027) | southwark.gov.uk |
| EICR in Sutton | None | Borough-wide (22 Mar 2026 to 21 Dec 2030) | sutton.gov.uk |
| EICR in Tower Hamlets | Ended 30 Sep 2026 (3 wards); licences already issued run until they expire | Borough-wide (to 31 Mar 2029) | towerhamlets.gov.uk |
| EICR in Waltham Forest | 20 of 22 wards (from 1 May 2025, for five years) | Borough-wide (to 31 Mar 2030) | walthamforest.gov.uk |
| EICR in Wandsworth | 7 wards (4 to 30 Jun 2030; 3 to 31 Mar 2031) | Borough-wide (to 30 Jun 2030) | wandsworth.gov.uk |
| EICR in Westminster | 15 of 18 wards (to 23 Nov 2030) | Borough-wide (31 Aug 2026 to 30 Aug 2031) | westminster.gov.uk |
Each borough page lists the wards by name, with the scheme dates and the council’s own sources.
How to check whether your home needs a licence
- Find your borough. Enter the postcode on our areas page and it takes you straight to the right one.
- Count the people and households. Five or more people from two or more households need a mandatory HMO licence anywhere in London. Three or four from two or more households need an additional licence wherever the council runs a scheme. One household or two sharers need a selective licence if the address is in a designated ward or street.
- Check the exact address. Use the council link in the table. Hammersmith and Fulham’s selective scheme covers 24 named streets, and Ealing’s selective wards follow the old, pre-May 2022 boundaries, so a ward name alone can mislead.
- Get your documents ready. Councils ask for safety documents with the application. Newham, for example, won’t let you finish without a current EICR, a gas safety certificate for any gas appliances and an energy performance certificate.
What councils want to see electrically
The 2020 regulations set the baseline, and licensing teams check it when you apply:
- A current EICR. The installation must be inspected and tested at least every five years — sooner if the last report says so. Ealing, Bromley and Hammersmith and Fulham (on its selective streets) ask for a satisfactory report, and Lewisham withdraws applications sent with out-of-date certificates.
- Proof that faults were fixed. A C1 (danger present) or C2 (potentially dangerous) makes a report unsatisfactory. The work must be done within 28 days of the inspection, or sooner if the report says so, and written confirmation from the electrician goes with the report to your tenants and the council within 28 days of finishing. Lambeth’s selective application asks for this proof up front.
- A copy when the council asks. The law gives you 7 days from a written request. Some licence conditions set their own deadlines — Camden 7 days, Hammersmith and Fulham 14 days, Brent 28 days for HMOs.
- More for HMOs. Shared homes can need more than an EICR: Bromley’s HMO standards, for example, also ask for yearly fire alarm and emergency lighting test certificates.
We carry out landlord EICRs and HMO EICRs across London and email you the report as a PDF, ready to upload with your application. See your price and pick a date.
Council by council: the electrical evidence
| Borough | What the council asks for |
|---|---|
| Barking and Dagenham | An EICR uploaded with every application; the council inspects the property before granting a licence |
| Barnet | An EICR dated within the last five years with every HMO licence application |
| Bexley | The online form lets you upload an EICR but doesn’t insist; licence conditions require a safe installation and a declaration of its safety if asked |
| Brent | HMOs: a current EICR, no more than five years old, sent within 28 days of a request, with C1 and C2 items fixed within 28 days of the report. Selective: a declaration that the installation is safe |
| Bromley | The council’s HMO standards require a satisfactory EICR no more than five years old, plus yearly fire alarm and emergency lighting test certificates |
| Camden | HMO conditions require a current test certificate for the fixed electrical installation, and a copy of the EICR within 7 days of a written request |
| City of London | No local scheme beyond mandatory HMO licensing; the five-yearly EICR duty still applies to private lets |
| Croydon | An EICR with every application; licence conditions require a new one every five years |
| Ealing | Every application must include an electrical report under five years old that says “Satisfactory” |
| Enfield | An EICR for selective licence applications; electrical safety documents for HMO applications |
| Greenwich | HMO licence conditions require an electrical check at least every five years |
| Hackney | Not a required document, but asked for to avoid delays; you must be able to declare the installation safe within 7 days of a request |
| Hammersmith and Fulham | HMOs: an EICR at least every five years from an electrician registered with a UKAS-accredited trade body, sent within 14 days of a written request. Selective streets: a satisfactory EICR under five years old at the start of each tenancy |
| Haringey | HMO applications must include an electrical safety certificate; selective licence holders give each tenant a copy of the current one at the start of the tenancy |
| Harrow | Selective and mandatory HMO applications both ask for an electrical safety certificate |
| Havering | Licence conditions require you to follow the electrical safety regulations in full, including a five-yearly report from a competent person |
| Hillingdon | Both HMO licence applications ask for a valid EICR |
| Hounslow | The HMO application asks for a current EICR from a competent electrician |
| Islington | The application checklist includes an EICR |
| Kensington and Chelsea | Both HMO licence applications ask for a current EICR |
| Kingston upon Thames | HMO applications must include proof that the installation is safe |
| Lambeth | An EICR for selective and HMO licences; the selective application also asks for proof that any C1 or C2 items were fixed |
| Lewisham | A valid EICR with every application; out-of-date certificates get the application withdrawn, and inspectors ask to see the originals |
| Merton | Licence conditions require the fixed wiring to be tested and certified by a qualified electrician at least every five years |
| Newham | You can’t complete an application without uploading a current EICR |
| Redbridge | An EICR is among the documents for both selective and HMO licence applications |
| Richmond upon Thames | The council’s HMO guidance says to arrange an electrical check at least every five years and get an updated EICR |
| Southwark | Licence conditions require safe electrics and electrical safety certification within 7 days if the council asks |
| Sutton | HMO applications must include proof that the installation is safe |
| Tower Hamlets | HMO applications must include an electrical safety certificate |
| Waltham Forest | An electrical certificate with HMO applications; selective licence holders must give the council a safety declaration on request |
| Wandsworth | An electrical safety certificate is a required document for every licence application |
| Westminster | An EICR with every selective and HMO application; selective licence conditions require a new EICR every five years |
Schemes changing soon
- Croydon — new selective (14 wards) and borough-wide additional schemes started on 25 September 2026.
- Tower Hamlets — the selective scheme in Weavers, Whitechapel and Spitalfields & Banglatown ended on 30 September 2026; licences already issued stay in force until they expire, and the council is considering a new scheme.
- Greenwich — consultation on extending selective licensing to 18 wards runs until 12 October 2026.
- Barnet — the council consulted until 15 September 2026 on selective licensing in ten wards.
- Harrow — the borough-wide additional scheme ran to 5 August 2026, and the council has consulted on renewing it.
- Islington — selective licensing widens to seven more wards on 23 November 2026.
- Lambeth — the additional HMO scheme is due to end on 8 December 2026.
- Southwark — the additional scheme and the five-ward selective scheme are due to end on 1 March 2027.
- Ealing — the additional scheme and the first selective designation end on 31 March 2027; the council has consulted on a new additional scheme from April 2027.
- Lewisham — the additional scheme runs to 4 April 2027.
- Hammersmith and Fulham — both of its own schemes run until 4 June 2027.
When a scheme is due to end, check the council page for a renewal before you assume no licence is needed.
Book your landlord EICR
If your licence application needs an EICR, or your current report is close to five years old, book the inspection before you apply. We arrange access with your tenant or agent, test every circuit to BS 7671 and explain every code in plain English. A landlord EICR for any flat or house with one fuse board is £90 inc VAT (£75 + VAT); HMO prices are confirmed when you book, and nothing is booked until we call to confirm.
See your price and book, read about our HMO EICR service, or call us on 07500 202010. For the wider rules on shared homes, see our guide to HMO electrical safety.
Sources
- https://www.legislation.gov.uk/uksi/2020/312/contents
- https://www.legislation.gov.uk/uksi/2020/312/regulation/3
- https://www.gov.uk/government/publications/electrical-safety-standards-in-the-private-and-social-rented-sectors-guidance/electrical-safety-standards-in-the-private-and-social-rented-sectors-guidance
- https://www.legislation.gov.uk/uksi/2018/221/article/4/made
- https://www.lbbd.gov.uk/private-sector-housing/property-licensing
- https://www.barnet.gov.uk/housing/private-housing/houses-multiple-occupation
- https://www.bexley.gov.uk/services/housing/property-licensing/property-licensing-schemes
- https://www.brent.gov.uk/housing/landlords/property-licensing
- https://www.bromley.gov.uk/housing-advice-options/houses-multiple-occupation-hmo-advice-landlords
- https://www.camden.gov.uk/houses-multiple-occupation
- https://www.cityoflondon.gov.uk/services/environmental-health/housing-standards/private-rented-accommodation
- https://www.croydon.gov.uk/housing/landlords/selective-and-additional-hmo-licensing-schemes-2026
- https://www.ealing.gov.uk/info/201086/housing/3306/private_rented_properties
- https://www.enfield.gov.uk/services/housing/private-rented-property-licensing
- https://www.royalgreenwich.gov.uk/housing/letting-out-your-property/check-if-you-need-private-rented-property-licence
- https://www.hackney.gov.uk/property-licensing
- https://www.lbhf.gov.uk/housing/private-housing/landlords-and-licensing/property-licensing
- https://haringey.gov.uk/housing/private-sector-renting/property-licensing
- https://www.harrow.gov.uk/licences/selective-licensing
- https://www.havering.gov.uk/information-landlords/private-rented-property-licensing
- https://www.hillingdon.gov.uk/hmo
- https://www.hounslow.gov.uk/houses-multiple-occupation/hmo-licensing
- https://www.islington.gov.uk/housing/private-sector-housing/landlords/property-licensing
- https://www.rbkc.gov.uk/housing/information-homeowners-private-rented-tenants-and-landlords/houses-multiple-occupation-hmo
- https://www.kingston.gov.uk/housing/landlords-and-private-sector/houses-multiple-occupation-hmo
- https://www.lambeth.gov.uk/housing/landlords-licensing/selective-licensing-scheme
- https://lewisham.gov.uk/myservices/housing/private-tenants-and-landlords/landlords/hmo/apply-for-a-private-property-licence
- https://www.merton.gov.uk/council-tax-benefits-and-housing/private-housing/licensing
- https://www.newham.gov.uk/landlords-newham/rented-property-licensing
- https://www.redbridge.gov.uk/housing/landlords/selective-licensing/
- https://www.richmond.gov.uk/services/housing/private_housing/privately_rented_properties/hmo/apply_for_a_hmo_licence
- https://www.southwark.gov.uk/housing/private-tenants-and-landlords/private-rented-property-licensing/property-licensing
- https://www.sutton.gov.uk/businesses-and-licensing/licensing/houses-multiple-occupation/houses-multiple-occupation-hmo
- https://www.towerhamlets.gov.uk/lgnl/housing/Private-tenants-landlords-and-homeowners/Property-licensing/Licences/Property-Licensing-Scheme.aspx
- https://www.walthamforest.gov.uk/housing/private-sector-housing/private-rented-property-licensing-prpl/property-licensing-schemes
- https://www.wandsworth.gov.uk/housing/private-housing/private-rented-property-licences/property-licence-check/
- https://www.westminster.gov.uk/housing/private-sector-housing/selective-property-licensing
Facts checked 24 September 2026. This guide is general information, not legal advice.