Skip to content
EICR London Pro
EICR London Pro

Repairs & upgrades

Consumer unit (fuse board) replacement in London

An old fuse box or a consumer unit without RCD protection is a common reason for an EICR to recommend work. We replace it with a modern consumer unit, test every circuit, give you an Electrical Installation Certificate and notify Building Control before we start.

RCD-protected consumer unit supplying lighting, water heater and electric heating circuits above a heating programmer

Tested to BS 7671

The consumer unit — the fuse board — is where every circuit in your home starts. It holds the devices that protect each circuit and, on a modern board, the RCDs: the safety switches that cut the power in a fault. Old fuse boxes and boards without RCD protection are a common reason for an EICR to recommend work. Here's when replacement is — and isn't — the right answer, and exactly how we do it.

Do you really need a new consumer unit?

Not always, and we'll tell you honestly. An older board isn't automatically unsafe, and a C3 ("improvement recommended") doesn't make an EICR unsatisfactory. Replacement usually makes sense when:

  • your EICR records a C1 or C2 that a new board is the right fix for — for example, damage, signs of overheating, or no RCD protection where it's needed;
  • you still have an old fuse box with fuse wire and no RCD protection;
  • you're adding circuits — for an EV charger, a new kitchen or an extension — and the board has no room for them or can't give them the protection they need;
  • the board is damaged, or parts for it can no longer be found.

Sometimes a smaller job does the trick, such as adding RCD protection to particular circuits. If that's the right answer for your home, we'll say so. Our guide to consumer unit replacement after an EICR explains the choices.

Signs your board needs looking at

  • fuse wire or old plug-in fuses instead of switches;
  • no button marked "T" or "Test" anywhere on the board, which usually means there's no RCD;
  • an RCD that trips often, or won't reset;
  • scorch marks, a burning smell, or crackling and buzzing from the board;
  • a cracked or damaged case.

Why RCD protection matters

An RCD watches for electricity leaking to earth — through a damaged cable, a faulty appliance or a person — and cuts the power fast enough to help prevent a serious electric shock. Old fuse boxes don't have them, which is why missing RCD protection so often appears on EICR reports. A modern consumer unit puts RCD protection at the heart of your installation.

Building Regulations: how the work is notified

Replacing a consumer unit is notifiable building work under Part P of the Building Regulations. There are three ways it can be notified:

  1. a registered competent person self-certifies the work;
  2. a registered third-party certifier inspects and certifies it;
  3. a building notice goes to the local council's Building Control before the work starts.

We use the building notice route: we notify Building Control before we start, and your quote shows the Building Control fee, so there are no surprises. Building Control deals with Building Regulations compliance, and you receive our Electrical Installation Certificate (EIC) for the electrical work itself.

How we replace a consumer unit

  1. Look before we quote. We check the existing board, the circuits, the earthing and bonding, and the incoming supply. If the main fuse or the meter needs attention, we'll tell you who to contact — that equipment belongs to your network operator or energy supplier.
  2. Test the existing circuits first. A new board with RCD protection can expose faults an old fuse box was hiding, such as damaged insulation that would make the new RCD trip. If we find one, we explain it and quote before going further.
  3. Notify Building Control before the work starts.
  4. Fit the new consumer unit with RCD protection, every circuit connected and clearly labelled.
  5. Test everything — every circuit and every RCD — and record the results on your Electrical Installation Certificate.
  6. Show you round the new board: what each switch does, how to reset a tripped RCD, and how to use the test button.

What to expect on the day

The power has to be off while the old board comes out and the new one goes in, so expect to be without electricity for a large part of the day. A little planning helps:

  • keep fridge and freezer doors closed;
  • charge phones and laptops, and plan work calls elsewhere;
  • remember that heating and hot-water controls usually need power;
  • tell us about medical equipment, alarms or anything else that must stay on;
  • clear the area around the consumer unit.

Usually the new unit goes where the old one was. If it needs to move, or is larger than the old board, we explain any making good before we start. If your board is in a tight cupboard or a communal meter room — common in London flats — tell us when you request a quote, as it affects how we plan the work. For tenanted homes, we arrange the day with your tenant or agent.

Afterwards

Keep your Electrical Installation Certificate, and anything Building Control sends you, with your property documents. When you sell, the property information form asks about electrical work and certificates, so your buyer's solicitor may ask to see both.

For landlords

If your EICR coded the consumer unit C1 or C2, replacing it is remedial work. It must be done within 28 days (or sooner if the report says so), and you must send written confirmation, with the report, to your tenants and the council within 28 days of finishing. The Electrical Installation Certificate is the written confirmation you pass on. Our EICR remedial work service covers any other items on the report at the same time.

What affects the price

  • how many circuits the new board needs to serve;
  • the type of consumer unit and the protection each circuit needs;
  • whether the earthing or bonding needs upgrading at the same time;
  • any faults found on the existing circuits;
  • where the board is, and how easy it is to work on;
  • the Building Control notification.

You get a fixed quote, with VAT included, before anything is booked. You don't have to accept it.

Why book with us

  • Honest advice — we recommend a new board only when it's the right fix.
  • Tested before and after — every circuit, to BS 7671.
  • Properly certified — an Electrical Installation Certificate on completion.
  • Building Control notified before the work starts.
  • A fixed quote first, with no obligation.
  • Insured — £5m public liability insurance.
  • London-wide — all 32 London boroughs and the City of London.

Not had an EICR recently? Start with a homeowner EICR or a landlord EICR. The report shows whether a new board is needed, and what else to plan for.

Request a quote

Request a quote — tell us about your home and your current board, and we'll call to talk it through. Have your EICR to hand if you have one. Or call us on 07301 010244.

FAQ

Questions about Consumer unit replacement

Do I need a new consumer unit?
Not necessarily. An older board isn't automatically unsafe, and sometimes a smaller job — such as adding RCD protection to particular circuits — deals with the problem. Replacement makes sense when your EICR finds a C1 or C2 that a new board is the right fix for, when you still have fuse wire and no RCD protection, or when you're adding circuits the board can't take. It's notifiable work, so we notify Building Control before we start.
Will an old fuse box fail an EICR?
Not automatically. An EICR codes what the electrician finds, not the age of the board. An old fuse box in good condition may only get a C3 (improvement recommended), which doesn't make the report unsatisfactory. It becomes a C1 or C2 if there's a real safety problem — damage, overheating, or circuits without protection they need. Either way, we explain what the code means and whether replacing the board is the right fix.
Does replacing a consumer unit need Building Control?
Yes — replacing a consumer unit in a home is notifiable building work under Part P of the Building Regulations. It can be self-certified by an electrician registered with a competent person scheme, certified by a registered third-party certifier, or notified to Building Control with a building notice before the work starts. We use the building notice route: we notify Building Control before we begin, and you get an Electrical Installation Certificate when the work is done.
What certificate do I get after electrical work?
It depends on the job. A new installation, a new circuit or a consumer unit replacement gets an Electrical Installation Certificate (EIC). Smaller jobs that don't add a circuit — replacing a damaged socket or adding a light, for example — get a Minor Electrical Installation Works Certificate. Landlords can pass these on as written confirmation that remedial work is done. An EICR is different: it reports on the condition of the whole existing installation.
What happens if my EICR is unsatisfactory?
Any C1 or C2 observation makes the report unsatisfactory (on older-format reports, an FI does too). We explain each item and quote for the remedial work — you are free to use any qualified electrician. For rented homes the work, and any further investigation the report asks for, must be done within 28 days (or sooner if the report says so), and you need written confirmation of the work for your tenants and the council.
How much does remedial work cost?
It depends entirely on what the report found — replacing a cracked socket and replacing a consumer unit are very different jobs — so we don't publish a price list. Instead, we price each item on your report separately and give you a fixed quote before any work starts, including the certificates and any Building Control notification. You're under no obligation to accept it, and you can use any qualified electrician.
Do I have to use you for the remedial work?
No. You're free to use any qualified electrician for remedial work, whoever carried out the inspection. We'll explain each item on the report in plain English and give you a fixed quote, item by item, so you can compare. If you're a landlord, make sure whoever does the work gives you written confirmation that it's done, so you can send it with the report to your tenants and the council within 28 days.
When and how do I pay?
There's no payment online. Booking on our website is a request: we call you to confirm the details, the price and how to pay before anything is arranged. If the property turns out to be different from what you told us — more consumer units, for example — we tell you the new price before we start, and you can choose not to go ahead.
Are you insured?
Yes. EICR London Pro is a trading name of Baharash Electrical Contractor Ltd, a company registered in England and Wales, and our work is covered by £5m public liability insurance. Every inspection is carried out to BS 7671, the UK wiring regulations, and nothing is booked until we've called to confirm the details with you.

Book your Consumer units today.

See your price, pick a preferred date, and we'll call to confirm.

Call us Get your price