Skip to content
EICR London Pro
EICR London Pro

EICR report example: a sample report, explained

This EICR report example shows what you get after an inspection: a sample EICR report for a two-bedroom London flat, with its overall result, coded observations and circuit test results. The property, readings and findings are made up for illustration — we never publish a real customer’s report.

Sample — fictional data

Electrical Installation Condition Report

Domestic · Periodic inspection and testing to BS 7671

Reason for the report
Private rented property — five-yearly check
Property
Two-bedroom flat, London (sample)
Extent
Whole fixed installation · 100% of circuits tested
Limitations
No floor coverings lifted; no fixed furniture moved
Supply
TN-C-S · 230 V · Ze 0.18 Ω · Ipf 1.2 kA
Earthing and bonding
Earthing 16 mm² · water bonded · gas not bonded

Overall assessment

Unsatisfactory

One observation is coded C2, so the installation is unsatisfactory until it is put right. A landlord must have the work done within 28 days of the inspection (or sooner if the report says so), then send written confirmation, with the report, to the tenant and the council within 28 days of the work being finished.

Observations

  1. 1 No main protective bonding to the incoming gas pipework. Bonding keeps metal pipes at the same voltage as the earth, so a fault can’t make them dangerous to touch. Potentially dangerous — urgent remedial work needed. C2
  2. 2 Socket-outlet circuit has no 30 mA RCD (additional protection). Current rules call for RCD protection on sockets. Not dangerous as installed, but improvement is recommended. C3
  3. 3 Consumer unit enclosure is not made of non-combustible material. Newer boards must be non-combustible. No sign of damage, so improvement is recommended rather than required. C3

Schedule of test results (extract)

# Circuit Device Cable mm² R1+R2 Ω IR MΩ Zs Ω RCD ms
1 Lighting B6 1.0 / 1.0 0.62 >200 0.80 —
2 Sockets (ring) B32 2.5 / 1.5 0.21 >200 0.39 —
3 Cooker B32 6.0 / 2.5 0.14 >200 0.32 —
4 Immersion heater B16 2.5 / 1.5 0.28 >200 0.46 —
5 Smoke alarms B6 1.0 / 1.0 0.55 >200 0.73 —

Recommendation

Put right the C2 item, then re-inspect within 5 years

Inspected by

Sample inspector — signatures appear on real reports

The EICR report example, section by section

The sample above follows the order of the model report form in BS 7671, the UK wiring regulations, as updated by Amendment 4 in 2026. A real report runs to several pages. Here’s what each part tells you, using the sample’s made-up figures.

1. The summary: who, why and which property

The first sections record who asked for the report, why it was done, when the inspection took place and which property it covers. In the sample, the reason is the five-yearly check on a privately rented two-bedroom flat.

2. Extent and limitations

This part says what was inspected and tested — and what wasn’t. The sample covers the whole fixed installation, with every circuit tested, but no floor coverings were lifted and no fixed furniture was moved. Unless you agree otherwise before the visit, cables hidden in walls, under floors and in roof spaces aren’t inspected.

Read this part closely. A report that tested only some circuits, or left out part of the property, tells you less than it seems.

3. Supply and earthing

Next come the electricity supply, the main switch, and how the installation is earthed and bonded. The sample has a TN-C-S supply, where the electricity network provides the earth connection. Ze (0.18 ohms) measures that earth path, and Ipf (1.2 kA) is the largest current that could flow in a fault. The earthing conductor is 16 mm² and the water pipe is bonded — but the gas pipe isn’t. That gap becomes the first observation.

4. Observations and their codes

Each problem found gets a number, a description and a code. The sample has three:

  • No main bonding to the gas pipe — C2, potentially dangerous. Bonding keeps metal pipes at the same voltage as the earth. Without it, a fault could make the pipe dangerous to touch, so urgent remedial work is needed.
  • No 30 mA RCD on the sockets — C3, improvement recommended. An RCD is the safety switch that cuts the power in a fault. Current rules call for one on sockets, but the circuit isn’t dangerous as installed.
  • Consumer unit not made of non-combustible material — C3, improvement recommended. Newer boards must be non-combustible. This one shows no sign of damage, so replacing it is advised rather than required.

On the 2026 form, C1 and C2 items are listed apart from C3 and FI items, so the urgent ones are easy to spot. Our guide to EICR codes explained goes through each code in more detail.

5. Schedule of test results

One row per circuit, with the readings the inspector took. The sample shows five circuits:

  • Device and cable — the circuit breaker (B32 means a type B breaker rated at 32 amps) and the size of the live and earth wires, in mm².
  • R1+R2 — the resistance of the circuit’s live and earth wires added together, which proves the earth wire is connected all the way. Low is good: 0.21 ohms on the socket ring.
  • IR — insulation resistance, in megohms. High is good: more than 200 on every circuit.
  • Zs — earth fault loop impedance, in ohms. It shows whether the breaker will cut the power quickly enough in a fault, so each reading must be below the limit for that breaker.
  • RCD — how fast each RCD trips, in milliseconds. The sample shows a dash because none of its circuits has an RCD, which is why the second observation appears.

A real report covers every circuit. It splits these columns across a schedule of circuit details and a schedule of test results, and adds a schedule of inspection — a checklist of everything that was looked at.

6. Overall assessment and next inspection

On a real report the overall assessment sits near the front, in the summary of the installation’s condition. It’s explained last here because it follows from the codes. The sample is unsatisfactory because it has one C2. Its recommendation: put the C2 right, then inspect again within five years.

Satisfactory or unsatisfactory?

The overall result is unsatisfactory if there is any C1 (danger present) or C2 (potentially dangerous). C3s are recommendations and don’t make a report fail. On the latest report forms (BS 7671 Amendment 4, 2026) an FI — further investigation — is advisory too; older-format reports count an FI as unsatisfactory.

If you’re a landlord and your report is unsatisfactory, the work must be done within 28 days (or sooner if the report says so), and you must send written confirmation to your tenants and the council within 28 days of it being finished. Our guide to what happens after an unsatisfactory EICR explains the next steps.

Want a report like this for your property?

Every report we issue is emailed as a PDF, with each observation explained in plain English. See your price and pick a preferred date, or call us on 07500 202010.

FAQ

Questions about the report

What do C1, C2, C3 and FI mean?
C1 means danger present — immediate action is needed. C2 means potentially dangerous — urgent remedial work is required. C3 means improvement recommended — it does not fail the report. FI means something needs further investigation. Any C1 or C2 makes the report unsatisfactory; on the latest report forms FI is advisory, while older-format reports also count an FI as unsatisfactory.
What happens if my EICR is unsatisfactory?
Any C1 or C2 observation makes the report unsatisfactory (on older-format reports, an FI does too). We explain each item and quote for the remedial work — you are free to use any qualified electrician. For rented homes the work, and any further investigation the report asks for, must be done within 28 days (or sooner if the report says so), and you need written confirmation of the work for your tenants and the council.
How do I get my report?
We email your EICR as a PDF once it has been completed and checked. If anything needs fixing, the report and our quote explain what, why and how urgently. Keep the PDF somewhere safe: landlords must give copies to their tenants and may need to send one to the council.
Call us Book now

Book your EICR

Loading the booking form…